PROJECTS FOR BID
Buchanan & Cody Funeral Home: Jacksonville, IL
A 13,800 s.f. single story wood framed and masonry veneer facility with a detached 2,500 s.f. wood framed and masonry veneer residence.
Bid Date: April 21, 2008
Project Manager: Jesse Brenny
Covenant Church: Moose Lake, MN
A 12,000 s.f. single story, multi-level metal frame and masonry veneer building addition with manufactured steel building component attached to an existing wood frame single story with basement.
Bid Date: May 21, 2008
Project Manager: Jesse Brenny
Good Shepherd Households: Sauk Rapids, MN
• New 26,845 sf two-story building
• New 32,553 sf two-story building with basement
• Remodel 85,505 sf of existing building
Bid Date: July 10, 2008
Project Manager: Mike Dubsky
|